Elenia

7.1 Construction of new buildings Pirkkala, Finland

Project Details

Project ID

1234

Building Type

Gross Floor Area

2,000.0 m²

Permit Date

May 10, 2026

Construction Start

May 10, 2026

Reporting Year

2026

Assessment Summary

10%

1 of 10 criteria confirmed

Assessment in progress

Substantial Contribution

Objective: Climate Change Mitigation. Requires primary energy demand ≥ 10% below national NZEB threshold, plus GWP calculation for buildings > 5,000 m².

Criterion Requirement Project Value Result
SC-7.1-01 Primary energy demand (≥10% below NZEB) BREEAM-ympäristösertifiointi tavoitteena PASS
SC-7.1-02 Life-cycle GWP disclosure per EN 15978 (>5,000 m²)
SC-7.1-03 Air-tightness & thermal integrity testing (>5,000 m²)

Do No Significant Harm

Objective: Ensure the project does not significantly harm other environmental objectives.

Objective Requirement Assessment Basis Result
DNSH-7.1-ADAPT Climate risk assessment & adaptation (Appendix A)
DNSH-7.1-WATER Water appliance efficiency (non-residential, Appendix B & E)
DNSH-7.1-CIRCULAR ≥70% C&D waste recovery & circularity design (ISO 20887)
DNSH-7.1-POLLUTION Chemical restrictions: formaldehyde, VOC, SVHC, REACH, POP, CLP (Appendix C)
DNSH-7.1-BIODIVERSITY EIA, Natura 2000 assessment, forbidden land types (Appendix D)

Minimum Safeguards

Company-level compliance with OECD Guidelines, UN Guiding Principles, ILO Core Labour Standards, and Anti-corruption requirements.

PASS

Article 8 Financial Data

Financial metrics allocated to this project for company-level CSRD aggregation.

Metric Value Eligible Aligned Result
Turnover (Revenue) €— 100% 0% (pending) PENDING
CapEx €— 100% 0% (pending) PENDING
OpEx €— 100% 0% (pending) PENDING

Generated on August 15, 2026

Close
Close