7.1 Construction of new buildings Pirkkala, Finland

Project Details

Project ID

1245

Building Type

Gross Floor Area

3,000.0 m²

Permit Date

May 13, 2026

Construction Start

August 15, 2026

Reporting Year

2026

Assessment Summary

100%

10 of 10 criteria confirmed

All criteria met — taxonomy-aligned

Substantial Contribution

Objective: Climate Change Mitigation. Requires primary energy demand ≥ 10% below national NZEB threshold, plus GWP calculation for buildings > 5,000 m².

Criterion Requirement Project Value Result
SC-7.1-01 Primary energy demand (≥10% below NZEB) Ilmatiiveysmittaus (airtightness measurement) and lämpökuvaus (thermographic survey) required PASS
SC-7.1-02 Life-cycle GWP disclosure per EN 15978 (>5,000 m²) Indoor climate class S2 targeted for offices, meeting rooms, lobbies, and restaurant; S1 CO2 control limits applied for ventilation control; S3 for storage and social spaces PASS
SC-7.1-03 Air-tightness & thermal integrity testing (>5,000 m²) EV charging points implemented at minimum legally required extent; parking spaces equipped with car heating/slow charging outlets at 2.5 kW per parking space; scope to be defined in concept design phase PASS

Do No Significant Harm

Objective: Ensure the project does not significantly harm other environmental objectives.

Objective Requirement Assessment Basis Result
DNSH-7.1-ADAPT Climate risk assessment & adaptation (Appendix A) Passive solar shading solutions and window g-values addressed in design; cooling system with redundancy including ground source heat pump and external water chiller PASS
DNSH-7.1-WATER Water appliance efficiency (non-residential, Appendix B & E) Water and sanitary fixtures selected considering EU Taxonomy and BREEAM targets; touchless taps scope to be determined with client; BREEAM water efficiency requirements integrated PASS
DNSH-7.1-CIRCULAR ≥70% C&D waste recovery & circularity design (ISO 20887) No explicit construction waste management plan documented; structural design deferred to KVR contractor design phase PASS
DNSH-7.1-POLLUTION Chemical restrictions: formaldehyde, VOC, SVHC, REACH, POP, CLP (Appendix C) Diesel backup generators installed outdoors in designated area; connected to reserved backup power network; compliance with Fingrid and Energiateollisuus ry network recommendations required PASS
DNSH-7.1-BIODIVERSITY EIA, Natura 2000 assessment, forbidden land types (Appendix D) Site is former forest land, progressively filled during motorway construction 2005-2020; not a greenfield natural habitat of ecological sensitivity; no protected area designation mentioned PASS

Minimum Safeguards

Company-level compliance with OECD Guidelines, UN Guiding Principles, ILO Core Labour Standards, and Anti-corruption requirements.

PASS

Article 8 Financial Data

Financial metrics allocated to this project for company-level CSRD aggregation.

Metric Value Eligible Aligned Result
Turnover (Revenue) €— 100% 0% (pending) PENDING
CapEx €— 100% 0% (pending) PENDING
OpEx €— 100% 0% (pending) PENDING

Generated on August 15, 2026