I've extracted 46 potential facts from Elenia - Toiminnallisuusselostus_päivittyvä.docx. Please review and confirm the ones below.
Co-Pilot · 15:41
I've extracted 31 potential facts from Elenia - Toiminnallisuusselostus_päivittyvä.docx. Please review and confirm the ones below.
Proposed fact
Passive solar shading solutions and window g-values addressed in design; cooling system with redundancy including ground source heat pump and external water chiller
Proposed fact
Stormwater retention required per zoning plan: 1 m3 delay tank per 180 m2 of roof and paved area; stormwater directed primarily to stormwater sewer; infiltration to ground not feasible due to soil and groundwater conditions
Co-Pilot assists with evidence collection. Taxonomy criteria are validated by the Rule Engine.