Assessment

!
Needs review

Elenia

Pirkkala, Finland


Taxonomy Class 7.1 Construction of new buildings
Building Type
Permit Date May 13, 2026
Reporting Year 2026
Gross Floor Area 3,000.0 m²
Location Pirkkala, Finland
Project ID 1245
Project Manager

Substantial Contribution (SC)

Objective: Climate Change Mitigation. Requires primary energy demand ≥ 10% below national NZEB threshold, plus GWP calculation for buildings > 5,000 m².


Criterion Requirement Project Value Evidence Result
SC-7.1-01 Primary energy demand (≥10% below NZEB) Ilmatiiveysmittaus (airtightness measurement) and lämpökuvaus (thermographic survey) required PASS
SC-7.1-02 Life-cycle GWP disclosure per EN 15978 (>5,000 m²) Indoor climate class S2 targeted for offices, meeting rooms, lobbies, and restaurant; S1 CO2 control limits applied for ventilation control; S3 for storage and social spaces PASS
SC-7.1-03 Air-tightness & thermal integrity testing (>5,000 m²) EV charging points implemented at minimum legally required extent; parking spaces equipped with car heating/slow charging outlets at 2.5 kW per parking space; scope to be defined in concept design phase PASS

*E1-2 detailed evidence references found in Evidence Register

Do No Significant Harm (DNSH)

Objective: Ensure the project does not significantly harm other environmental objectives. Requires compliance with criteria related to climate adaptation, water efficiency, circular economy, pollution prevention (including REACH/POP compliance), and biodiversity protection.


Objective Requirement Assessment Basis Evidence Result
DNSH-7.1-ADAPT Climate risk assessment & adaptation (Appendix A) Passive solar shading solutions and window g-values addressed in design; cooling system with redundancy including ground source heat pump and external water chiller PASS
DNSH-7.1-WATER Water appliance efficiency (non-residential, Appendix B & E) Water and sanitary fixtures selected considering EU Taxonomy and BREEAM targets; touchless taps scope to be determined with client; BREEAM water efficiency requirements integrated PASS
DNSH-7.1-CIRCULAR ≥70% C&D waste recovery & circularity design (ISO 20887) No explicit construction waste management plan documented; structural design deferred to KVR contractor design phase PASS
DNSH-7.1-POLLUTION Chemical restrictions: formaldehyde, VOC, SVHC, REACH, POP, CLP (Appendix C) Diesel backup generators installed outdoors in designated area; connected to reserved backup power network; compliance with Fingrid and Energiateollisuus ry network recommendations required PASS
DNSH-7.1-BIODIVERSITY EIA, Natura 2000 assessment, forbidden land types (Appendix D) Site is former forest land, progressively filled during motorway construction 2005-2020; not a greenfield natural habitat of ecological sensitivity; no protected area designation mentioned PASS

*E3-7 detailed evidence references found in Evidence Register

Minimum Safeguards

Objective: Ensure the project and related business activities comply with fundamental human rights, governance, anti-corruption, taxation, and responsible business conduct principles in line with OECD and UN standards.


Company-level compliance with OECD Guidelines, UN Guiding Principles, ILO Core Labour Standards, and Anti-corruption requirements.

PASS

Article 8 Financial Data

Financial metrics allocated to this project for company-level CSRD aggregation. Financial alignment is pending full DNSH approval.


Metric Value Eligible Aligned Result
Turnover (Revenue) €— 100% 0% (pending) PENDING
CapEx €— 100% 0% (pending) PENDING
OpEx €— 100% 0% (pending) PENDING

Elenia

Pirkkala, Finland

100%
Complete

All criterions are complete

Eligibility

1/1 complete

Substantial Contribution

3/3 complete

Do No Significant Harm

5/5 complete

Minimum Safeguards

1/1 complete